Hera Engineering has initially been engaged by Future Generation Joint Venture (FGJV) – a group comprising of Webuild, Clough and Lane Construction – to provide Temporary Works engineering services at Snowy 2.0.
We have been engaged for both permanent and temporary structural design services.
Snowy 2.0 will connect the Tantangara and Talbingo reservoirs via a 27-kilometre tunnel and a new underground power station.
Once complete, the project will underpin the future of clean energy in Australia by operating as a pumped-hydro battery, supporting grid stability and renewable energy integration.
Our responsibilities extend beyond design to include structural inspection services site wide, such as:
By providing engineering that enables practical construction outcomes in remote and technically demanding conditions, we are supporting the development of infrastructure aligned with Australia’s energy transition targets.




