Woolworths, Clarkson

Project Facts:

Location
Perth,
Market
Service
,
Project Completion

Developer: Woolworths Supermarkets
Architect: Brown Falconer
Builder: Perkins Builders

The recently completed Woolworths in Clarkson stands as a remarkable exemplar of sustainability in construction. Originally slated as a conventional reconstruction project involving the demolition of the existing Bunnings store to make way for a new shopping centre, a transformative change was ushered in by the intervention of Hera Engineering.

Hera Engineering’s innovative proposition advocated for the retention of the existing structure. Through meticulous initial assessment, Hera verified the structural integrity of the pre-existing framework, offering a compelling alternative to the initial plan of complete demolition.

This departure from the norm underscores Hera’s commitment to delivering unparalleled value to its client. A departure from the standard “yes” approach, Hera’s ethos revolves around challenging conventions and reimagining possibilities to arrive at optimal solutions for projects, clients, and the environment.

The revised redesign repurposed the existing structure while incorporating new extensions to amplify the internal space, resulting in the creation of a contemporary and dynamic shopping centre. Hera’s pioneering approach serves as a resounding testament to their dedication to sustainability, adapting an established structure into a fresh architectural expression.

The outcome of this innovative strategy translated into tangible benefits for the community and the environment. By sidestepping complete demolition and maximising the use of existing steelwork, the project minimised traffic disturbances and expedited construction timelines. Impressively, the new building boasts a remarkable one-third reduction in embedded carbon compared to constructing an entirely new edifice, all thanks to the meticulous reclamation and repurposing of the existing steel components.

As a completed project, the remarkable achievement stands a shining example of sustainable engineering and construction practices. Hera’s foresight not only facilitated a substantial reduction in carbon emissions by eschewing demolition and reconstruction but also orchestrated a seamless transformation of existing materials into a durable, enduring structure, leaving a lasting imprint on both the built environment and the realm of sustainability.