East Fremantle Oval Precinct Redevelopment

Project Facts:

Location
Market
Services
Project Completion

Hera Engineering is proud to have been selected by Cooper & Oxley for the East Fremantle Oval Precinct Redevelopment. Our primary responsibility involves the design of the post-tension suspended slab, encompassing diverse loadings, stringent deflection criteria, and integrated steelwork. Leveraging our expertise in post-tension design, we deliver a comprehensive and detailed design package.

With our skilled team excelling in post-tension engineering, we ensure strict adherence to the highest industry standards throughout the project’s lifecycle.

Through advanced technical expertise and practical on-site supervision, we strive for architectural and engineering excellence. In a testament to our proficiency, our detailed design process resulted in a significant reduction in the total tonnage of post-tension and reinforcement required, surpassing the estimations of the original engineer. This achievement translates into substantial cost savings for both the builder and the City of Fremantle.

More projects