This brand new Aged Care Facility include integrated office, parking and landscaping. The project is design by MJA Studio in joint venture with MKDC.
It is on a site 3.13 hectares and will comprise a mix of 2 and 3 bedroom units over 3 storeys.
Hera Engineering was appointed by Georgiou Development due to our high level of service on previous projects.
We have investigated various structural options for the project and a concrete frame structure was selected with localised transfer areas. Shallow foundations were adopted