A proposal to the City Council has been delivered for Mos Lane development. This residential building proposes the construction of two to six storey buildings containing 83 apartments and townhouses, a supermarket, shops, cafes, a liquor store and a gym at the existing shopping centre off Manning and Wellington Streets.
The $48.8 million plan was unveiled by ADC in order to redevelop the Mosman Heights neighbourhood centre. The concept design, by NH Architecture constitutes a 766sqm expansion of retail floorspace and 2,136 square metres of publicly accessible space on the ground floor and is expected to draw 162 new residents.
For more than three years, ADC has been working with the local government, councillors and surrounding residents to progress the plans. More than 570 submissions were received during the consultation process for this project, 485 of which opposed the proposal.
Last week the proposal was released for public consultation and it will be assessed in the coming months by the Western Australian Planning Commission.
Hera Engineering has been appointed to assist NH Architects and ADC to develop a cost effective DA design to achieve an economical structural solution in line with the architectural vision and planning. We look forward to see the project under construction in 2021.
