Value Engineering & Structural Design solutions for the Exchange Precinct Project


Site establishment for this project began in July 2019, with construction expected to be completed for the beginning of semester one in 2022. 

Exchange is a $300M project and it is the first precinct to be delivered at Curtin University’s Perth Campus in response to the Greater Curtin Master Plan. This ambitious project is designed by architect Nettleton Tribe and it is stage one of this transformational build that will cultivate a vibrant social, professional and commercial urban community. 

Hera Engineering involvement with Probuild started during the tender period. Our team worked on an alternative structural system which has resulted in more than $10M cost saving and reduced the construction program by 6 months.

Hera Engineering has provided value engineering, structural design, post tension and temporary works design.  

We are looking forward to seeing the project completed very soon.